Project Overview
Our scope of work at the Central Presbyterian Church included architectural dimensioned stone cladding. The stonework is featured throughout the project including beautiful features to church and building entries.
1870
Total Man-hours
May 2018
Completion Date
1400 sf
Granite Cladding
1200
Concrete Block
Mechanically Fastened Granite Cladding
The dimensioned stone, Cambrian Platinum, was installed in a variety of applications including mechanical fastening, thin-set backup, and a combination of other anchoring installation methods. The stonework is featured across main entrances, landscaping and planters, wall copings, and lower lever veneer cladding.